Hello,
we are running into a problem using plantour.
See attachments.
What can be the problem?
Regards,
Christian Freund
Plan tour UnscheduledOrderIds
Plan tour UnscheduledOrderIds
- Attachments
-
- Screenshots.pdf
- (397.39 KiB) Downloaded 377 times
-
- Response2.xml
- Orderid 10 is scheduled. But if you calculate a route on the result, the last transportorder is on the next day.
But if you turnarond the order, everything is on one day. - (18.3 KiB) Downloaded 357 times
-
- Request2.xml
- Tour with a timeframe on the last transportorder on two days.
- (12.42 KiB) Downloaded 374 times
-
- Response1.xml
- Orderid 10 is not scheduled
- (16.46 KiB) Downloaded 382 times
-
- Request1.xml
- Tour with a timeframe on the last transportorder on one day.
- (12.32 KiB) Downloaded 345 times